All TOPSTAR scaffolding board design with non-slip surface and sufficient drainage.
The primary production material is Q235 steel, which gives it a high capacity and long lifespan. Pre-galvanized and hot-dip coated surfaces offer sufficient durability while providing great weather resistance and protecting the steel board from corrosion..
Those steel boards available in a range of lengths from 0.5m to 4.0m and have a depth of 38mm to 63mm and width of 210,240,225,230,250mm without hook, Steel Hook Board with Hooks are in sizes of 210mm-500mm width.
The metal scaffolding boards from TOPSTAR are in compliance with BS1139, EN12811, and the most contemporary scaffolding safety standards. All TOPTSTAR boards provide a reliable, long-lasting solution to meet any access needs.
Property of Scaffolding Steel Board |
|
Surface: |
Pre-galvanized;Hop Dip Galvanized;Black |
Material: |
Q195-Q235 |
Standard: |
BS EN 12811-1;EN1004:2004 |
Certificate |
ISO,SGS,BV TUV |
Available Size |
||||
Types |
Width |
Height |
Thickness |
Length |
240 |
240mm |
45mm |
1.0mm-2.0mm |
1-3m |
250 |
250mm |
50mm |
||
420 |
420mm |
45mm |
||
450 |
450mm |
45mm |
||
480 |
480mm |
45mm |
||
500 |
500mm |
50mm |
1.Flanging and concave and convex perforations on the surface provide good anti-skid properties.
2. In order to boost compressive strength and satisfy various client needs, trapezoid stiffeners and box type stiffeners are inserted in the middle.
3. The product has a wonderful and durable appearance thanks to the uniform molding and the clear hole spacing.
4. The surface groove has non-slip holes, and the bottom of the recognizable sand leaking holes has anti-sand accumulation points.
5. Galvanized surface, fire proof and anti-slide.
Material Rolled --- Punching--Bending ---Cutting-----Welding
Construction, Petrochemical, Marine, Oil & Gas, Insulation
In Vietnam, the Philippines, Singapore, Malaysia, the United Arab Emirates, and other nations, Topstar Scaffolding has participated in scaffolding project cases.
Vietnam :DUNG QUAT Refinery Plant,
Steel Plank:250*50*1.2mm*2000/3000/4000mm 200tons.
Hot Dip Galvanized pipes:48.3*3.2*6000mm 100 tons
BS1139 couplers 50 tons.
Vietnam: Goverment Ringlock Project,
Scaffolding Ringlock :300 tons Standard and Ledger 48.3*3.0mm.42*2.5mm
HDG Base Jack 38*4*600mm 8000 pcs
HDG U Jack:38*4*600mm 6000 pcs
Singapore: Alpha 1 Heat Recovery Project Phase
Scaffolding planks 240*45*1.2mm with length 200 tons
Hot Dip Galvanized steel pipe 48.6*2.4*6000mm 200 tons
JIS Couplers:100 tons
Philippines: Construction Maintenance
Scaffolding planks 240*45*1.2mm with length 200 tons
Hot Dip Galvanized steel pipe 48.6*2.4*6000mm 200 tons
JIS Couplers:100 tons
FAQ
Q1.Why TOPSTAR Scaffolding?
As an essential part of infrastructure construction,the quality of scaffolding is the primary safety guarantee of each project.TOPSTAR company has accumulated rich supply experience in scaffold production practice and other solutions.More than ten years of brand persistence,to contribute for the world's reliable Chinese manufacturing force.Regardless of the order size,Topstar Scaffolding has injected 100% professional team strength to ensure the quality of each order.We have successfully passed numerous customer facory audits and professional third-party testing.We actively cooperate with customers to arrange the whole process of manufacturing supervision when necessary.
Q2.How we manufacture the planks?
For the manufacturing of the Planks, TOPSTAR uses both Roll forming and CNC bending machines to provided customised width and length. For the Difffferent type of Embossing we are using Hydraulic and Mechanical Power Presses according to Embossing Style. Our Tool Room and R&D Department take care of Dies and Punches and New developments.For the Assemblies and Welding we have certified welders and Automatic Robotic Welding
Machines. We utilise the type of welding as per Planks Design.
Q3.How is the plank quality?
http://www.tsscaffold.com/